Asbestos support for major installation, refurbishment and construction projects

Project-led asbestos surveys, targeted sampling, analytical support and remediation planning for large installations, fit-outs, M&E upgrades, roofing, renewable-energy schemes, refurbishment and demolition programmes.

UKAS 32982Technical capability
Major ProjectsConstruction support
NationalUK delivery
F&I GroupWider delivery capability
ConfidentialControlled projects

Project asbestos information must match the work being undertaken

A generic survey can leave critical gaps when the project reaches site. ASM reviews drawings, proposed service routes, demolition boundaries, intrusive works and installation details so the asbestos investigation reflects what contractors are actually going to disturb.

Pre-construction review

Review surveys, registers, drawings and specifications before defining additional investigation.

Intrusive project surveys

Refurbishment and demolition surveys aligned to the real work boundary.

Component investigation

Targeted sampling of boards, seals, gaskets, insulation, plant and suspect components.

Removal planning

Convert survey findings into practical remediation requirements.

Analytical support

Air monitoring and clearance planned into the programme where applicable.

Enabling works

Interfaces with soft strip, access, roofing, scaffolding and wider Group delivery.

Project environments already supported by ASM

Construction

Major contractor programmes

Repeat asbestos support during tender, mobilisation, refurbishment and construction delivery.

Defence

Controlled MOD-related sites

Project support where access, confidentiality and controlled information are integral to delivery.

Healthcare & education

Occupied capital works

Surveys and remediation interfaces designed around live building environments.

Renewables

Wind and BESS installations

Targeted component investigation and brownfield asbestos support.

Project confidentiality is maintained throughout

Client names, site locations, defence information, technical findings, programmes and controlled documentation are not made public without approval.

A project-manager-friendly asbestos workflow

1. Drawings

Provide work packages, plans, service routes and existing records.

2. Gap review

Identify exactly where further investigation is required.

3. Investigation

Complete targeted surveys and sampling with clear limitations.

4. Delivery

Plan remediation, clearance and enabling work into the programme.

Send us the drawings before you send a generic survey request

For major projects, the best starting point is the actual project scope, drawings, programme and existing asbestos records.