ASM asbestos removal specialists wearing PPE at an industrial site
UK asbestos removal services · ASM · F&I Group

Licensed & Non-Licensed Asbestos Removal Across the UK

Professional asbestos removal for homes, commercial property, construction, refurbishment, demolition, industrial sites and public-sector estates across England, Scotland and Wales.

ASM directly undertakes appropriate non-licensed and notifiable non-licensed asbestos work. Where a project requires an HSE-licensed asbestos contractor, licensable work is delivered through F&I Group's licensed capability within Flowing Construction Services Ltd, operating under HSE asbestos licence 202505985.

2,500+ removal projects Successfully completed in the last 12 months
HSE-licensed capability Standard licence 202505985
Complete work categories Licensed · NNLW · Non-licensed
National coverage England · Scotland · Wales
Removal-specific contractor assurance

Proven asbestos-removal capability backed by F&I Group

Group contractor assurance, recognised management systems, asbestos-industry membership, established waste arrangements and licensed asbestos capability support projects from individual domestic removals through to complex commercial and construction programmes.

CHAS

Contractor assurance.

SMAS Worksafe

Contractor assurance.

Constructionline Gold

Supplier assurance.

Achilles

Supplier assurance.

TrustMark

Registered quality scheme.

ACAD

Asbestos-industry membership.

ISO 9001

Quality management.

ISO 14001

Environmental management.

ISO 45001

Health and safety management.

Waste arrangements

Registered carrier routes.

Suspect asbestos damaged or disturbed?

Stop work, restrict access and avoid sweeping, drilling, cutting, scraping, pressure-washing or moving the material. Do not use a domestic vacuum cleaner.

If the material has not been confirmed, ASM can arrange professional asbestos sampling and laboratory analysis . If asbestos debris or contamination has already spread, see asbestos debris and contamination clean-up .

Removal is not always the first answer

Choose the action that matches the asbestos, risk and planned work

Finding asbestos does not automatically mean everything should be removed. The correct decision depends on material condition, location, vulnerability, future disturbance and what is planned for the building.

Existing ACM

Manage in place

Sound asbestos that can be protected and is unlikely to be disturbed may sometimes remain under an asbestos register, management plan and risk-based reinspection programme.

Remedial option

Repair or encapsulate

Controlled repair, protection, enclosure or encapsulation can sometimes provide a proportionate alternative to complete removal where future disturbance can be reliably controlled.

Planned removal

Controlled asbestos removal

Removal is appropriate where asbestos is damaged, vulnerable, obstructs refurbishment or demolition, or cannot be protected and reliably managed in place.

One coordinated F&I Group asbestos route

Licensed, NNLW and non-licensed asbestos capability

The work category cannot be selected from the asbestos product name alone. Material type, condition, friability, task, work method, duration and likely exposure must all be considered.

ASM asbestos specialists

Non-licensed & notifiable non-licensed work

Asbestos Surveying & Monitoring Ltd directly undertakes appropriate non-licensed and notifiable non-licensed asbestos work using trained, competent personnel and project-specific controls.

Where NNLW applies, the relevant notification, medical-surveillance and health-record requirements are incorporated into the project.

HSE-licensed F&I Group capability

Licensed asbestos removal

Where an HSE asbestos licence is required, the licensed element is delivered through Flowing Construction Services Ltd within F&I Group under asbestos licence 202505985.

The contracting entity, applicable licence and individual project responsibilities are confirmed within the quotation and project documentation.

One Group route

Survey information, removal planning, work classification, access, waste arrangements and project interfaces can be coordinated.

Wider construction capability

Scaffolding, access, roofing, construction and associated project requirements can be coordinated through F&I Group.

Documented responsibilities

Scope, contracting entity, removal classification, analytical arrangements and handover requirements are established.

Controlled asbestos waste

Packaging, transport, authorised disposal and appropriate project documentation form part of the work.

Evidence of practical removal delivery

More than 2,500 asbestos removal projects completed in the last 12 months

Our asbestos delivery operation supports work ranging from individual domestic asbestos items to commercial portfolios, construction programmes, industrial sites and complex higher-risk removal.

Domestic projects

Garage roofs, sheds, flooring, textured coatings, panels, soffits and other ACMs within homes and rented property.

Commercial property

Offices, retail, housing portfolios, managed estates and occupied premises requiring planned asbestos remediation.

Public-sector estates

Education, healthcare and public property where removal must integrate with occupation and programme requirements.

Construction & industry

Refurbishment, demolition, enabling works, industrial premises, plant areas and redevelopment programmes.

National asbestos material removal hub

Asbestos-containing materials we assess and remove

The correct work route depends on condition, task and potential fibre release rather than simply the asbestos product name. Use the dedicated removal and cost links below for the material relevant to your project.

Asbestos cement

Garage Roofs

Corrugated asbestos-cement garage, shed and outbuilding roofing.

Bonded ACM

Cement Sheets & Products

Corrugated sheets, panels, cladding, gutters and other asbestos-cement construction products.

Cement / board

Soffits & Fascias

Asbestos-containing soffit and fascia products, including correct distinction between cement and insulating board.

Asbestos cement

Flues & Ducts

Asbestos-cement flues, ventilation ducts and associated service products.

Asbestos cement

Water Tanks & Cisterns

Asbestos-cement tanks and cisterns in lofts, plant rooms and older buildings.

Flooring ACM

Floor Tiles & Adhesives

Thermoplastic and vinyl tiles, bitumen adhesive and associated flooring ACMs.

Method dependent

Artex & Textured Coatings

Decorative textured coatings to ceilings and walls, including coating-only and wholesale-removal options.

Higher-risk board

Asbestos Insulating Board — AIB

Panels, partitions, ceilings, soffits, fire breaks and service riser board.

Licensed asbestos work

Pipe Lagging & Thermal Insulation

Friable asbestos insulation to pipes, boilers, calorifiers, vessels, valves and industrial plant.

Licensed asbestos work

Sprayed / Limpet Coatings

High-risk sprayed asbestos insulation and fire-protection coatings to structural surfaces.

Licensed asbestos work

Loose-Fill Asbestos

Extremely friable asbestos insulation within lofts, floor voids, cavities and concealed spaces.

Licensable board

Asbestos Millboard

High-asbestos-content heat and fire-resistant board around electrical equipment and industrial plant.

Product dependent

Paper, Felt & Cardboard

Roofing felt, flooring backing, paper linings and insulation products.

Industrial ACM

Gaskets, Rope & Textiles

CAF gaskets, asbestos rope seals, yarn, string and textile products in plant and heating equipment.

Bonded ACM

Bitumen, Mastic & Sealants

Floor bitumen, window and door mastic, sealants, fillers, putty and other bonded asbestos compounds.

Assessment required

Debris & Contamination

Clean-up following accidental disturbance, damaged ACMs, historic poor removal and asbestos-containing dust.

From asbestos evidence to documented handover

How an asbestos removal project is managed

1
Review

Review the asbestos survey or laboratory result, photographs, condition, dimensions, building use and proposed work.

2
Define the scope

Establish work boundaries, quantities, access, occupation, programme, waste requirements and exclusions.

3
Classify & plan

Determine whether work is non-licensed, NNLW or licensable and establish the applicable project controls.

4
Remove & hand over

Complete controlled removal, waste management, applicable analytical requirements and completion documentation.

Before asbestos removal begins

Do you need an asbestos survey or sample first?

Adequate information about the material, location and extent is required before the correct removal method and work category can be determined.

One suspect material

Professional sampling

Sampling may be suitable where the enquiry concerns one defined suspect ACM rather than a wider building question.

Refurbishment planned

Refurbishment survey

Intrusive asbestos information should match the rooms, voids and building elements affected by the proposed work.

Demolition planned

Demolition survey

Demolition asbestos information should cover the full defined demolition boundary before structural work begins.

UKAS accreditation boundary

ASM UKAS accreditation 32982

ASM holds UKAS accreditation number 32982 for defined asbestos inspection and testing activities and locations shown within its current accredited schedules.

UKAS accreditation applies to those inspection and testing activities. Asbestos removal itself is not UKAS accredited.

Analytical requirements

Air monitoring & four-stage clearance where required

Not every removal task requires air monitoring. Analytical requirements should match the asbestos material, work category, building occupation and question being answered.

Applicable licensed enclosure work requires the appropriate four-stage clearance process before a Certificate for Reoccupation is issued.

Controlled asbestos waste route

Asbestos waste management and project documentation

Removal is not complete when the ACM leaves the work area. Waste remains controlled through packaging, transport, disposal and project documentation.

Package & label

Asbestos waste is suitably contained and labelled according to the material and work being undertaken.

Controlled transport

Transport follows the applicable registered waste-carrier arrangements and authorised waste routes.

Documented disposal

Applicable hazardous-waste consignment and completion documentation forms part of the project record.

Asbestos removal pricing

How much does asbestos removal cost?

Removal cost depends on asbestos type, quantity, condition, work category, access, height, enclosure requirements, waste, analytical support and programme.

The national cost guide remains the main general pricing page, supported by dedicated material-specific cost pages.

Material-specific cost guides

Local delivery · national coordination

Find your local ASM asbestos removal service

Use the closest local removal page for regional information and direct links into the wider ASM service cluster. National and multi-site projects can be coordinated centrally.

Commercial & multi-site programmes

National asbestos removal for property portfolios and construction programmes

National clients can use one coordinated route for asbestos-removal programmes covering multiple buildings, locations or project phases.

Consistent scope

Common quotation assumptions, work-category assessment and project controls can be applied across a portfolio while allowing for local conditions.

Regional mobilisation

Projects can be allocated through appropriate ASM and F&I Group resources according to location, programme and work category.

Connected asbestos services

Surveys, sampling, laboratory analysis, removal, air monitoring, four-stage clearance and asbestos management can be coordinated.

Frequently asked questions

UK asbestos removal FAQs

Does ASM carry out asbestos removal across the UK?
Yes. ASM and F&I Group support asbestos-removal projects across England, Scotland and Wales for domestic, commercial, industrial, public-sector and construction clients.
How much asbestos removal work does ASM carry out?
Our asbestos delivery operation successfully completed more than 2,500 asbestos-removal projects during the last 12 months.
Are you licensed to remove asbestos?
ASM directly undertakes appropriate non-licensed and notifiable non-licensed work. Where an HSE asbestos licence is required, the licensed element is delivered through Flowing Construction Services Ltd within F&I Group under asbestos licence 202505985.
Does every asbestos removal need a licensed contractor?
No. Work may be non-licensed, notifiable non-licensed or licensed. Classification depends on material type, condition, task, work method, duration and likely exposure.
Which asbestos materials does ASM remove?
Appropriate routes are available for asbestos cement, garage roofs, soffits, flues, water tanks, floor tiles, adhesives, textured coatings, AIB, pipe lagging, sprayed coatings, loose-fill asbestos, millboard, paper and felt, gaskets, ropes, bitumen, mastics and asbestos contamination.
Is there a dedicated page for each asbestos material?
Yes. The ASM asbestos material-removal hub provides dedicated removal and associated cost pages for the principal asbestos-containing materials found in UK buildings and plant.
Does all asbestos need to be removed?
No. Suitable asbestos in good condition may sometimes remain safely managed where it is protected, recorded and unlikely to be disturbed.
Do I need an asbestos survey before removal?
Adequate information is required to confirm the material, location and extent. One defined suspect material may require professional sampling, while refurbishment or demolition can require an appropriately scoped intrusive survey.
Is asbestos removal UKAS accredited?
No. ASM's UKAS accreditation number 32982 applies to defined asbestos inspection and testing activities within its current accredited scope. Asbestos removal itself is a separate activity.
Is four-stage clearance required after every asbestos removal?
No. Analytical requirements depend on the work. Applicable licensed enclosure work requires the appropriate four-stage clearance process before a Certificate for Reoccupation is issued.
What happens to asbestos waste?
Asbestos waste is appropriately contained, labelled and transported through the applicable registered waste-carrier arrangements to an authorised disposal route with relevant documentation.
How much does asbestos removal cost?
Price depends on material type, quantity, condition, work category, access, height, enclosure requirements, waste, analytical support and programme. ASM provides both a national cost guide and material-specific cost pages.
What should I send ASM for a removal quotation?
Send the site address or postcode, asbestos survey or laboratory result, photographs, approximate quantities or dimensions, access information, planned works and required programme.
Request a project-specific quotation

Request a written asbestos-removal quotation

Send the site address or postcode, asbestos survey or laboratory result, photographs, approximate quantities or dimensions, access information, planned works and required programme.