Leeds and West Yorkshire · ASM · F&I Group

Asbestos Removal Leeds

Planned asbestos removal for homes, schools, landlords, commercial property, farms, industrial buildings and construction projects throughout Leeds and West Yorkshire.

ASM directly delivers suitable non-licensed and notifiable non-licensed asbestos work. Where the work is licensable, delivery is provided through Flowing Construction Services Ltd within F&I Group under HSE asbestos licence 202505985.

2,500+ removal projects in the last 12 months Licensed · NNLW · Non-licensed routes HSE licence 202505985 Leeds regional office
Assured group delivery

Recognised contractor and management credentials

The F&I Group credential portfolio supports controlled asbestos-removal delivery, supply-chain assurance, quality, environmental management and occupational health and safety.

Credential scope applies to the relevant Group entity and service. Project-specific contracting, licence and accreditation details are confirmed in the quotation and project records.

2,500+Asbestos-removal projects completed in the last 12 months
One Group routeSuitable non-licensed, NNLW and licensed delivery
Controlled wasteRegistered waste-carrier arrangements and project records
UKAS 32982Defined inspection and testing activities—not removal itself
Start with the material and task

The correct Leeds removal route depends on the actual work

Finding asbestos does not automatically mean everything must be removed. Material type, condition, extent, location, likely disturbance and the planned work determine whether it can remain managed or requires non-licensed, NNLW or licensed removal.

Suitable lower-risk work

Non-licensed work

Appropriate lower-risk work can be completed by trained, competent ASM personnel using the required assessment, plan of work, controls, PPE/RPE, hygiene and waste arrangements.

Additional requirements

Notifiable non-licensed work

Some work is non-licensed but still notifiable because of the material, its condition or the way it will be disturbed. ASM incorporates notification, medical-surveillance and health-record requirements where applicable.

Higher-risk material or task

Licensed removal

Licensable work is delivered through Flowing Construction Services Ltd within F&I Group under HSE asbestos licence 202505985, with the responsible contracting entity confirmed in the project documentation.

Where removal is unnecessary

Manage or encapsulate

Sound asbestos that is unlikely to be disturbed may sometimes remain under an effective register, management plan and reinspection programme. View Leeds asbestos management.

Recent Leeds-area delivery

Local asbestos-removal work with practical project outcomes

The following recent work demonstrates how programmes, access, occupation and the building's next use shape the removal plan. Client and school names are withheld for confidentiality.

Summer 2026 · Education

Planned asbestos removal works across six Leeds schools

During the 2026 summer holiday period, ASM and F&I Group completed planned asbestos removal works at six local schools across the Leeds area.

The works were undertaken within a very tight, pre-agreed programme so that the required school improvement works could proceed and each building could be prepared for reopening before pupils returned. The individual scopes included the controlled removal of asbestos insulating board (AIB), asbestos thermal insulation and asbestos-cement products, together with asbestos floor tiles and the associated asbestos-containing bitumen adhesive and screed beneath. Each work area was planned against the available asbestos information, material type and condition, access restrictions, follow-on trades and the required completion date.

  • Programme coordination with the responsible estates, project and site teams
  • Controlled access, segregation and task-specific plans of work
  • Correct classification of each activity as licensed, NNLW or non-licensed
  • Removal controls selected for AIB, thermal insulation, asbestos cement, floor tiles and associated bitumen residues
  • Waste packaging, transfer and project documentation
  • Analytical or clearance arrangements where required by the work
  • Documented completion and handover to support the agreed reopening programme
Project outcomeAll identified asbestos-containing materials within the agreed removal scopes were successfully removed within the required timescales. This allowed the follow-on improvement works to proceed and the schools to be prepared for reopening as programmed.
School and academy support

What Leeds estates teams should send

  • Current asbestos register, survey and reinspection information
  • Marked-up plans and exact work areas
  • Holiday access dates and reopening deadline
  • Details of contractors or refurbishment work following removal
  • Site safeguarding, security, isolation and permit requirements
  • Required handover and analytical documentation
Steel-framed farm building near Leeds after asbestos-cement roof sheets have been removed, leaving a clean open building shell
Representative completed condition: an agricultural steel frame after controlled asbestos-cement roof removal, with the site cleared for the next roofing stage.
Leeds rural area · Agricultural building

Asbestos-cement roof removal from a farm building outside Leeds

A recent rural project involved removing asbestos-cement roof sheets from an agricultural building just outside Leeds. The work required the asbestos controls to be integrated with fragile-roof precautions, work-at-height planning, farm access and the condition of the supporting steel structure.

Working to the task-specific plan of work, RAMS and ASM asbestos-cement removal SOPs, the site team established the controlled work area, fragile-roof controls and safe access arrangements before starting removal. Suitable fibre-suppression measures were maintained while the sheet fixings were released individually, allowing the asbestos-cement panels to be removed whole wherever reasonably practicable without being dropped or deliberately broken. The sheets were lowered in a controlled manner. They were then wrapped in 1,000-gauge polythene and placed directly into the awaiting sealed, lockable asbestos-waste skip before transfer under the applicable waste-carrier and consignment arrangements to an appropriately permitted hazardous-waste facility. Once the roof covering had been removed, the exposed purlins, steelwork, ledges and surrounding work area were systematically cleaned with Class H vacuum equipment fitted with HEPA filtration, with all visible fragments, residues and associated waste removed. An independent consultant from a UKAS-accredited asbestos organisation then completed the agreed completion assessment and detailed visual inspection, confirming that the removal areas had been fully cleared and H-vacuumed before handover. The building was released for the client's next roofing or construction phase only after this independent assessment and confirmation that all asbestos waste had left the site through the controlled waste route.

Project outcomeControlled removal, documented waste transfer and a clear building shell ready for follow-on work without discarded asbestos-cement sheets remaining around the farm.
Leeds buildings and materials

Removal planning for homes, schools, farms and commercial property

Leeds and West Yorkshire contain housing of many periods, education estates, converted mills, warehouses, engineering property, retail and offices, together with agricultural buildings around the city's rural edge. The scope must reflect the actual material and what will happen to the building next.

Leeds property or projectTypical removal-related considerationsUseful next route
Schools and managed estatesHoliday programming, safeguarding, segregated access, phased work, register updates and reopening deadlines.Leeds asbestos management
Homes, landlords and housingAsbestos cement, floor tiles and adhesive, textured coating, soffits, panels, water tanks, flues and shared access.Leeds asbestos sampling
Mills, factories and warehousesAIB, service-riser linings, fire protection, insulation, cement roofing, old plant and multiple refurbishment phases.Leeds refurbishment surveys
Farms and rural buildingsFragile asbestos-cement roofs, working at height, sheet condition, livestock or machinery segregation, access and reroofing interfaces.Cement-roof removal guidance
City-centre commercial propertyOccupied neighbours, restricted loading, shared services, out-of-hours access and coordination with fit-out or strip-out work.Leeds asbestos surveys
Demolition and redevelopmentIntrusive survey coverage, removal boundaries, programme interfaces, structural access and waste segregation.Leeds demolition surveys
From evidence to handover

How a Leeds asbestos-removal project is scoped and delivered

Review the evidence

Assess the survey or laboratory result, material condition, dimensions, access, occupation and the work that follows removal.

Confirm the work category

Determine the appropriate licensed, NNLW or non-licensed route and identify any notification, enclosure, analytical or access requirements.

Complete controlled work

Deliver the task under the agreed plan of work with the required competence, PPE/RPE, hygiene, access and waste controls.

Document the handover

Provide applicable waste records and analytical or clearance documentation, then confirm the area or building's agreed handover condition.

Do you need a survey before removal?

Adequate information is needed about the material, location and extent. One defined suspect product may need professional sampling, while refurbishment or demolition work can require an appropriately intrusive survey.

Choose the correct Leeds asbestos survey →

Air monitoring and four-stage clearance

Not every removal requires air monitoring. Applicable licensed enclosure work requires the appropriate four-stage clearance process before a Certificate for Reoccupation is issued. Analytical independence and accreditation arrangements are confirmed for the actual project.

Leeds air monitoring and clearance support →
Written project scope

How much does asbestos removal cost in Leeds?

Price depends on the material, quantity, condition, work category, access, height, enclosure requirements, waste volume, analytical support, programme restrictions and any associated building or reinstatement work.

The dedicated Leeds asbestos-removal cost guide explains the main cost factors. A project quotation should be based on the actual evidence and access rather than a generic online figure.

Send these details for an accurate quotation

  • Full Leeds or West Yorkshire site address
  • Existing asbestos survey or laboratory result
  • Photographs and approximate quantities or dimensions
  • Height, access and occupation information
  • Planned refurbishment, demolition or reroofing work
  • Required completion or reopening date
Leeds regional office

Speak to the Leeds asbestos-removal team

Asbestos Surveying & Monitoring Ltd
Ground Floor, Radley House
Richardshaw Road
Pudsey, Leeds
LS28 6LE

Supporting Leeds City Centre, Pudsey, Headingley, Kirkstall, Armley, Holbeck, Hunslet, Beeston, Chapel Allerton, Roundhay, Horsforth, Morley, Rothwell, Garforth, Seacroft, Cross Gates, Wetherby, Otley, Guiseley, Yeadon, Bramley, Middleton and surrounding West Yorkshire areas.

Leeds enquiries

0113 532 7195 removal@asbestosSM.co.uk Monday–Friday 08:00–18:00
Frequently asked questions

Asbestos Removal Leeds FAQs

Do you carry out asbestos removal throughout Leeds and West Yorkshire?
Yes. ASM and F&I Group support domestic, education, commercial, industrial, agricultural, public-sector and construction projects throughout Leeds, Pudsey and surrounding West Yorkshire areas, subject to project scope and availability.
Has ASM recently completed asbestos-removal work in Leeds schools?
Yes. During the 2026 summer holiday period, ASM and F&I Group completed planned asbestos removal works at six local schools across the Leeds area. The scopes included AIB, asbestos thermal insulation, asbestos-cement products, floor tiles and associated asbestos-containing bitumen adhesive and screed. All agreed removal works were completed within the required programme, allowing the follow-on school improvement works and reopening preparations to proceed.
Can you programme school asbestos work during holidays?
Yes, subject to scope and availability. Send the asbestos register or survey, marked-up work areas, access dates, reopening deadline and any refurbishment information as early as possible so the survey, removal, analytical and handover requirements can be coordinated.
Are you licensed to remove asbestos?
ASM directly undertakes suitable non-licensed and notifiable non-licensed work. Where an HSE asbestos licence is required, the licensed element is delivered through Flowing Construction Services Ltd within F&I Group under HSE asbestos licence 202505985.
What is the difference between licensed, NNLW and non-licensed asbestos work?
The category depends on the material, condition, friability, task, duration, work method and likely exposure. Some higher-risk work is licensable; some non-licensed work is nevertheless notifiable; and suitable lower-risk work may be non-licensed. The correct category must be assessed for the actual task.
Can you remove asbestos-cement roofs from farm buildings near Leeds?
Yes. Farm-building work can involve fragile asbestos-cement roof sheets, height access, machinery or livestock segregation, sheet condition, waste transfer and coordination with reroofing. These factors are incorporated into the project-specific assessment and plan.
Can you remove an asbestos garage roof in Leeds?
Yes. The quotation considers roof size, sheet condition, height, access, supporting structure, waste quantity and whether the client needs the walls, frame or entire garage removed. See the dedicated Leeds garage-roof removal page for more information.
Does every asbestos-containing material need to be removed?
No. Sound material that is unlikely to be disturbed may sometimes remain managed under an asbestos register, management plan and suitable reinspection programme. Removal is more likely where material is damaged, vulnerable, cannot be reliably protected or conflicts with planned work.
Do I need an asbestos survey before removal?
Adequate information is required to define the material, location and extent. One specific suspect product may need professional sampling, while intrusive refurbishment or demolition work can require the appropriate project survey.
Is air monitoring required after every asbestos removal?
No. Background, reassurance, leak, personal and clearance monitoring have different purposes. Applicable licensed enclosure work requires the appropriate four-stage clearance process before a Certificate for Reoccupation is issued. Requirements are determined from the actual work.
Is asbestos removal UKAS accredited?
No. ASM's UKAS accreditation number 32982 applies to defined inspection and testing activities within the current accredited scope. Asbestos removal itself is a separate controlled activity and is not described as UKAS accredited.
What happens to asbestos waste from a Leeds project?
Waste is appropriately contained, labelled, transported through the applicable registered waste-carrier arrangements and transferred to an authorised disposal route. Relevant consignment or transfer documentation forms part of the project records.
How much does asbestos removal cost in Leeds?
Cost depends on material type, quantity, condition, work category, height, access, enclosure and analytical requirements, waste volume, programme restrictions and associated building work. Send the report, photographs, dimensions and site details for a written project quotation.
Which local areas does the Leeds team cover?
The Leeds team supports the city centre, Pudsey, Headingley, Kirkstall, Armley, Holbeck, Hunslet, Beeston, Chapel Allerton, Roundhay, Horsforth, Morley, Rothwell, Garforth, Seacroft, Cross Gates, Wetherby, Otley, Guiseley, Yeadon, Bramley, Middleton and surrounding West Yorkshire areas.
Leeds asbestos removal

Send the evidence and let the Leeds team scope the work correctly

Send the Leeds or West Yorkshire address, asbestos report or laboratory result, photographs, approximate quantities, access information and required programme. The team can identify the appropriate delivery route and prepare a written quotation.