Demolition Asbestos Survey Doncaster — investigate the structure before it is broken apart
Locate hidden ACMs before demolition plant and operatives expose them
A Demolition Survey investigates the defined structure at a much more intrusive level than a Management Survey. It should be planned around what is being demolished and what is retained.
Full demolition
Investigate the structure comprehensively before complete demolition begins.
Partial demolition
Define demolition and retained boundaries so the survey matches the actual work.
Soft strip / deconstruction
Coordinate survey access with ceilings, floors, services, walls and other elements being stripped.
An old Management Survey is not a demolition clearance document
HSE states that refurbishment or demolition surveys must locate and identify hidden ACMs before structural work begins, and that ACMs should be removed so far as reasonably practicable before major refurbishment or demolition.
See HSE guidance and ASM's national Demolition Survey page.
Useful demolition-survey inputs
- demolition drawings
- retained structures
- soft-strip sequence
- existing asbestos records
- structural information
- services and isolations
- below-ground interfaces
- access and programme constraints
Survey → scope asbestos work → complete controls → proceed with demolition
Define the boundary
Confirm exactly what is being demolished and what remains.
Investigate intrusively
Open the relevant building fabric under controlled survey arrangements.
Deal with ACMs
Plan removal or required controls before demolition disturbs the materials.
Provide project information
Use the report and completion records as part of pre-construction information.
Connect asbestos findings to the demolition programme
Use the survey evidence to define the removal, analytical and ground-risk workstreams before the programme moves on.
Removal scope
Price known ACMs against the actual demolition survey findings rather than generic allowances.
Removal cost
Use Doncaster guide prices for early budgeting, then obtain a fixed scope-based quotation.
Air monitoring / clearance
Book analytical support before the demolition programme relies on an enclosure handback date.
Below the slab
A building Demolition Survey does not automatically clear made ground or previous demolition fill beneath the structure.
Pre-demolition surveys for rail, industrial, commercial and regeneration sites
Rail and engineering heritage
Older depots, workshops, service buildings, warehouses and industrial property can contain asbestos in roofs, wall panels, fire protection, insulation, plant, ducts and later office additions that need resolving before demolition.
Former industrial and mining land
Doncaster's mining, manufacturing and waste-disposal history means redevelopment sites can combine standing-building asbestos with demolition debris or made ground.
Building asbestos and contaminated-land risks need separate but coordinated workstreams, including where redevelopment affects former industrial plots around Thorne and Wheatley.
Soft strip & partial demolition
Where façades, frames or adjoining structures remain, the survey should still investigate every building element the demolition sequence will disturb, including ceilings, floors, partitions, risers, services and plant.
Party walls, neighbouring occupation, basements, restricted loading and structural hazards can affect the destructive inspection sequence. Define the full depth of the work rather than relying on the project label.
Doncaster and South Yorkshire supported through ASM's Leeds regional office
ASM supports projects throughout Doncaster and South Yorkshire through its Leeds regional team. UKAS-accredited bulk sample analysis is undertaken at ASM's Sunderland headquarters laboratory within the applicable accredited scope.
ASM Leeds Regional Office
Ground Floor
Radley House
Richardshaw Road
Pudsey, Leeds
LS28 6LE
Doncaster & South Yorkshire:
0113 532 7195
Survey:
survey@asbestosSM.co.uk
Monday–Friday
08:00–18:00
UKAS Accreditation No. 32982
Doncaster & South Yorkshire coverage
Doncaster City Centre, Balby, Bessacarr, Wheatley, Intake, Hexthorpe, Hyde Park, Bentley, Scawsby, Sprotbrough, Cusworth, Armthorpe, Edenthorpe, Kirk Sandall, Barnby Dun, Rossington, Cantley, Auckley, Finningley, Bawtry, Tickhill, Conisbrough, Mexborough, Thorne, Hatfield, Stainforth, Askern and Moorends, with wider attendance across South Yorkshire and the surrounding Yorkshire region.
Attendance is subject to project requirements, scope, access and availability.
ASM's defined asbestos inspection activities are accredited to ISO/IEC 17020 and defined testing activities to ISO/IEC 17025 under UKAS accreditation number 32982. Current UKAS schedules define the precise scope and accredited locations.
Doncaster services connected to demolition
Connect the pre-demolition survey to removal, analytical support, contaminated-land work and wider redevelopment information.
Doncaster & South Yorkshire FAQs
When is a Demolition Asbestos Survey required?
It is used before full or partial demolition where the asbestos information needs to cover the structure being broken apart.
Can a Management Survey be used before demolition?
No. A Management Survey is not a substitute for the intrusive asbestos information required for the demolition boundary.
Does a Demolition Survey involve destructive inspection?
Yes. It is highly intrusive because hidden ACMs need to be investigated before structural demolition exposes them.
What happens if asbestos is found?
The findings are used to define removal or other required controls before demolition disturbs the ACMs.
Does the survey include asbestos in soil?
Not automatically. Made ground and buried demolition materials require separate contaminated-land consideration.
Define the demolition boundary before the destructive survey starts
Send drawings, demolition scope, retained structures, soft-strip sequence, existing asbestos information, isolation constraints and programme. ASM can prepare the intrusive survey scope and written quotation.