Different air tests answer different project questions
Air monitoring should be selected from the question that needs answering, rather than added automatically.
Background monitoring
Establish conditions before work or provide a comparison point where justified.
Leak monitoring
Assess defined locations outside a controlled enclosure while relevant work is taking place.
Personal monitoring
Assess exposure associated with a particular person, activity and sampling period.
Reassurance monitoring
Provide evidence after a concern, cleaning activity or controlled task where the sampling objective is defined.
Formal clearance is more than an air test
Review site condition, work scope and readiness for detailed inspection.
Inspect the enclosure and work area carefully for visible dust, residue and debris.
Undertake prescribed air sampling after a satisfactory visual inspection.
Assess the former enclosure area after dismantling before completing the process.
0.010 f/ml is a clearance indicator — not zero fibres
The applicable Stage 3 clearance indicator is 0.010 fibres per millilitre. It should not be described as proof of zero fibres and is not the GB worker control limit.
The current GB control limit is 0.1 fibres/ml averaged over four hours, and HSE states that the control limit is not a safe exposure level.
Stage 3 clearance indicator
0.010 f/ml Different from the 0.1 f/ml four-hour workplace control limitThe certificate depends on satisfactory completion of the full applicable process
A satisfactory fibre count alone is not the complete four-stage clearance. Visual cleanliness, job completeness and final assessment are also part of the handback decision.
Late booking can delay enclosure handback and follow-on construction.
Air monitoring for licensed removal, occupied property and defined reassurance questions
Background, leak, personal or clearance monitoring may be relevant where asbestos work takes place beside occupied areas or programme-critical spaces.
Where applicable, the clearance process combines site-condition checks, thorough visual inspection, Stage 3 air monitoring and final assessment after enclosure dismantling.
A low reassurance result should not replace source assessment, material identification or controlled cleaning where those actions are still required.
Air monitoring for licensed work, occupied buildings and sensitive interfaces
Background, leak, personal and clearance monitoring may be relevant around controlled work in workshops, warehouses, plant areas and operational sites.
The monitoring scope should reflect the work method, adjacent occupation and the exact question the analyst has been asked to answer.
A reassurance result should not replace source assessment, material identification or controlled cleaning where those actions remain necessary.
Dundee and Tayside supported by ASM's Scottish survey, analytical and project teams
Dundee projects are coordinated through ASM's Scottish regional team. James Brown, Regional Manager Scotland, coordinates Scottish enquiries with ASM surveyors, analysts and project teams. East and Central Scotland support is based from Edinburgh, with additional Scottish resource from Glasgow. UKAS-accredited bulk sample analysis is undertaken at ASM's Sunderland headquarters laboratory within the applicable accredited scope.
ASM Scotland Team
James Brown
Regional Manager Scotland
Edinburgh office
Third Floor
3 Hill Street
Edinburgh
EH2 3JP
0131 202 4096
Glasgow office
Suite 2–3, 48 West George Street
Glasgow
G2 1BP
0141 212 9351
National: 0330 433 9680
Dundee, Tayside & East Central Scotland coverage
Dundee City Centre, Waterfront, City Quay, West End, Perth Road, Blackness, Hilltown, Stobswell, Maryfield, Lochee, Charleston, Menzieshill, Downfield, Kirkton, Fintry, Whitfield, Douglas, Broughty Ferry, Barnhill and Invergowrie, with wider attendance across Monifieth, Carnoustie, Arbroath, Forfar, Kirriemuir, Perth, Newport-on-Tay, Tayport, Cupar and the wider Tayside / North East Fife area subject to project requirements.
Attendance is subject to project requirements, scope, access and availability.
Dundee & Tayside FAQs
What types of asbestos air monitoring are available in Dundee?
What are the four stages of asbestos clearance?
What is the Stage 3 clearance indicator?
Is 0.010 f/ml the workplace control limit?
Does a low air test mean the building is asbestos-free?
When is a Certificate of Reoccupation issued?
Define what the air test needs to answer before the analyst arrives
Send the site address, asbestos material, removal or incident details, plan of work where applicable, enclosure information, monitoring objective and programme. ASM can confirm the analytical scope.