Pre-demolition asbestos surveys · Dundee and Tayside

Demolition Asbestos Survey Dundee — investigate the structure before it is broken apart

Highly intrusive pre-demolition asbestos surveys for full and partial demolition, soft strip and redevelopment across Dundee and Tayside.
UKAS 32982ISO/IEC 17020 InspectionIntrusive Pre-Demolition SurveyDundee & Tayside
Dundee Waterfront redevelopment beside Tay Road Bridge — Laerol / Wikimedia Commons, CC0
Dundee & Tayside enquiries
Scotland team lead
James Brown · Regional Manager Scotland
Survey enquiries
National enquiries

Locate hidden ACMs before demolition plant and operatives expose them

A Demolition Survey investigates the defined structure at a much more intrusive level than a Management Survey. It should be planned around what is being demolished and what is retained.

Full demolition

Investigate the structure comprehensively before complete demolition begins.

Partial demolition

Define demolition and retained boundaries so the survey matches the actual work.

Soft strip / deconstruction

Coordinate survey access with ceilings, floors, services, walls and other elements being stripped.

An old Management Survey is not a demolition clearance document

HSE states that refurbishment or demolition surveys must locate and identify hidden ACMs before structural work begins, and that ACMs should be removed so far as reasonably practicable before major refurbishment or demolition.

See HSE guidance and ASM's national Demolition Survey page.

Useful demolition-survey inputs

  • demolition drawings
  • retained structures
  • soft-strip sequence
  • existing asbestos records
  • structural information
  • services and isolations
  • below-ground interfaces
  • access and programme constraints

Survey → scope asbestos work → complete controls → proceed with demolition

1

Define the boundary

Confirm exactly what is being demolished and what remains.

2

Investigate intrusively

Open the relevant building fabric under controlled survey arrangements.

3

Deal with ACMs

Plan removal or required controls before demolition disturbs the materials.

4

Provide project information

Use the report and completion records as part of pre-construction information.

Connect asbestos findings to the demolition programme

Use the survey evidence to define the removal, analytical and ground-risk workstreams before the programme moves on.

Removal scope

Price known ACMs against the actual demolition survey findings rather than generic allowances.

Removal cost

Use Dundee guide prices for early budgeting, then obtain a fixed scope-based quotation.

Air monitoring / clearance

Book analytical support before the demolition programme relies on an enclosure handback date.

Below the slab

A building Demolition Survey does not automatically clear made ground or previous demolition fill beneath the structure.

Pre-demolition surveys for redevelopment, industrial sites and constrained urban projects

City Quay, Broughty Ferry & former industrial land

Older warehouses, workshops and development plots can combine standing-building asbestos with demolition fill or made-ground concerns that need separate but coordinated workstreams.

Constrained city sites

Shared walls, retained façades, neighbouring occupation, restricted loading and structural hazards can affect the destructive survey sequence and areas that can be opened safely.

Soft strip & major internal demolition

Where the shell remains but ceilings, floors, partitions, M&E and plant are removed, the survey boundary should match the full depth of the strip-out rather than the label attached to the project.

Pre-demolition surveys for waterfront, industrial and former mill sites

Waterfront regeneration

Dundee's Waterfront has undergone major redevelopment. Older structures, retained services and previously developed land can create linked building-asbestos and ground-risk requirements.

Former mills, depots & warehouses

Industrial buildings can contain asbestos in roofs, wall panels, fire protection, insulation, plant and later office additions that need resolving before demolition.

Soft strip & partial demolition

Where façades, structural frames or adjoining occupied areas remain, the survey should still investigate every building element the demolition sequence will disturb.

Dundee's current development planning continues to identify the Waterfront and Port as major strategic areas, so demolition and enabling surveys should be coordinated with the wider project programme.

Dundee and Tayside supported by ASM's Scottish survey, analytical and project teams

Dundee projects are coordinated through ASM's Scottish regional team. James Brown, Regional Manager Scotland, coordinates Scottish enquiries with ASM surveyors, analysts and project teams. East and Central Scotland support is based from Edinburgh, with additional Scottish resource from Glasgow. UKAS-accredited bulk sample analysis is undertaken at ASM's Sunderland headquarters laboratory within the applicable accredited scope.

ASM Scotland Team

James Brown
Regional Manager Scotland

Edinburgh office
Third Floor
3 Hill Street
Edinburgh
EH2 3JP
0131 202 4096

Glasgow office
Suite 2-3, 48 West George Street
Glasgow G2 1BP
0141 212 9351

National: 0330 433 9680

Monday–Friday
08:00–18:00

UKAS Accreditation No. 32982

Dundee, Tayside & East Central Scotland coverage

Dundee City Centre, Waterfront, City Quay, West End, Perth Road, Blackness, Hilltown, Stobswell, Maryfield, Lochee, Charleston, Menzieshill, Downfield, Kirkton, Fintry, Whitfield, Douglas, Broughty Ferry, Barnhill and Invergowrie, with wider attendance across Monifieth, Carnoustie, Arbroath, Forfar, Kirriemuir, Perth, Newport-on-Tay, Tayport, Cupar and the wider Tayside / North East Fife area subject to project requirements.

Attendance is subject to project requirements, scope, access and availability.

ASM's defined asbestos inspection activities are accredited to ISO/IEC 17020 and defined testing activities to ISO/IEC 17025 under UKAS accreditation number 32982. Current UKAS schedules define the precise scope and accredited locations.

Dundee & Tayside FAQs

When is a Demolition Asbestos Survey required?

It is used before full or partial demolition where the asbestos information needs to cover the structure being broken apart.

Can a Management Survey be used before demolition?

No. A Management Survey is not a substitute for the intrusive asbestos information required for the demolition boundary.

Does a Demolition Survey involve destructive inspection?

Yes. It is highly intrusive because hidden ACMs need to be investigated before structural demolition exposes them.

What happens if asbestos is found?

The findings are used to define removal or other required controls before demolition disturbs the ACMs.

Does the survey include asbestos in soil?

Not automatically. Made ground and buried demolition materials require separate contaminated-land consideration.

Define the demolition boundary before the destructive survey starts

Send drawings, demolition scope, retained structures, soft-strip sequence, existing asbestos information, isolation constraints and programme. ASM can prepare the intrusive survey scope and written quotation.