Demolition Asbestos Survey Cambridge — investigate the structure before it is broken apart
Locate hidden ACMs before demolition plant and operatives expose them
A Demolition Survey investigates the defined structure at a much more intrusive level than a Management Survey. It should be planned around what is being demolished and what is retained.
Full demolition
Investigate the structure comprehensively before complete demolition begins.
Partial demolition
Define demolition and retained boundaries so the survey matches the actual work.
Soft strip / deconstruction
Coordinate survey access with ceilings, floors, services, walls and other elements being stripped.
An old Management Survey is not a demolition clearance document
HSE states that refurbishment or demolition surveys must locate and identify hidden ACMs before structural work begins, and that ACMs should be removed so far as reasonably practicable before major refurbishment or demolition.
See HSE guidance and ASM's national Demolition Survey page.
Useful demolition-survey inputs
- demolition drawings
- retained structures
- soft-strip sequence
- existing asbestos records
- structural information
- services and isolations
- below-ground interfaces
- access and programme constraints
Survey → scope asbestos work → complete controls → proceed with demolition
Define the boundary
Confirm exactly what is being demolished and what remains.
Investigate intrusively
Open the relevant building fabric under controlled survey arrangements.
Deal with ACMs
Plan removal or required controls before demolition disturbs the materials.
Provide project information
Use the report and completion records as part of pre-construction information.
Cost and programme follow the agreed survey scope
For budgeting, use the Cambridge asbestos survey cost guide and its clearly labelled national reference figures. The final quotation depends on the number of buildings and rooms, required intrusion, sampling, safe access, occupation and report requirements.
Tell ASM about a purchase deadline, contractor start date or phased project before booking. Agree site attendance and report delivery separately, together with what happens if access is unavailable or the work boundary changes. Removal, analytical attendance and reinstatement are separate services unless the quotation expressly includes them.
Connect asbestos findings to the demolition programme
Use the survey evidence to define the removal, analytical and ground-risk workstreams before the programme moves on.
Removal scope
Price known ACMs against the actual demolition survey findings rather than generic allowances.
Removal cost
Use Cambridge guide prices for early budgeting, then obtain a fixed scope-based quotation.
Air monitoring / clearance
Book analytical support before the demolition programme relies on an enclosure handback date.
Below the slab
A building Demolition Survey does not automatically clear made ground or previous demolition fill beneath the structure.
Demolition within Cambridge estates and mixed-age sites
One building within an occupied site
Mark the structure being removed, retained buildings and all connecting services. Explain pedestrian routes and adjacent occupation before intrusive inspection is arranged. The affected survey area must be appropriately vacated and controlled while necessary access to shared interfaces is resolved.
Annexes, plant enclosures and outbuildings
Provide a complete schedule of structures, including small stores or service enclosures that may be absent from a headline site description. Define which equipment or associated fabric is included. Existing records can assist the brief but do not establish that every concealed element within demolition scope has been investigated.
Slabs, below-ground services and fill
A building survey does not by itself answer the groundworks question. Where demolition is followed by excavation or removal of below-ground structures, review available ground evidence and any separate asbestos-in-soils requirement. Keep building removal completion records distinct from decisions about excavated material.
UKAS-accredited inspection and testing, with the scope kept clear
Asbestos Surveying and Monitoring Ltd holds UKAS accreditation number 32982 for defined inspection activities to ISO/IEC 17020 and testing activities to ISO/IEC 17025. The current schedules define the accredited activities and locations. Bulk asbestos identification is undertaken at the Sunderland laboratory.
Accreditation applies to the organisation and its defined activities. Asbestos removal, preparation of management plans, watching briefs and soil remediation are not described as UKAS-accredited work.
Check ASM’s current UKAS schedules (search 32982) ↗ · Sunderland laboratory and submission guidance
Handover information for the demolition team
Confirm the deliverables when agreeing the commission, then review the information against the actual property or work scope.
- The exact structures, attachments and retained elements within or outside the survey.
- Identified and presumed asbestos with locations and relevant evidence.
- Any areas not safely accessed and the arrangements required to investigate them.
- Asbestos work and remaining restrictions to resolve before the demolition sequence reaches the affected fabric.
If a location, quantity or assumption is unclear, resolve it before the relevant maintenance or construction stage. Keep reports and completion evidence together so the next contractor can understand what was assessed, what changed and what still needs attention.
List all demolition structures and interfaces
- Main buildings, annexes, stores and service enclosures.
- Retained premises, occupation and shared connections.
- Structural safety and intrusive access arrangements.
- Separate excavation and ground-assessment requirements.
Cambridge service coverage and enquiries
ASM coordinates Cambridge enquiries and site attendance through its national team. Bulk sample analysis is undertaken at the Sunderland laboratory within the applicable accredited scope. Arrange attendance or sample submission before dispatching material.
ASM · Cambridge service enquiries
Site attendance by prior arrangement. Send the property address, required service and target dates.
National enquiries
0330 433 9680
Monday–Friday · 08:00–18:00
Cambridge and surrounding enquiries
Cambridge city centre, Chesterton, Arbury, King’s Hedges, Newnham, Romsey, Cherry Hinton and Trumpington.
Provide the full postcode, property use and intended work. Scope, safe access, programme and attendance are agreed for the individual instruction.
Discuss projects in central Cambridge, Chesterton, Arbury, King’s Hedges, Newnham, Romsey, Cherry Hinton and Trumpington. For surrounding locations such as Histon, Impington, Milton, Girton, Fulbourn, Great Shelford, Sawston and Waterbeach, provide the exact postcode and service required. Attendance is confirmed against scope, access and programme. A Cambridge postal address does not necessarily place a site within the city boundary.
Cambridge services connected to demolition
Connect the pre-demolition survey to removal, analytical support, contaminated-land work and wider redevelopment information.
Demolition Asbestos Survey Cambridge FAQs
When is a Demolition Asbestos Survey required?
It is used before full or partial demolition where the asbestos information needs to cover the structure being broken apart.
Can a Management Survey be used before demolition?
No. A Management Survey is not a substitute for the intrusive asbestos information required for the demolition boundary.
Does a Demolition Survey involve destructive inspection?
Yes. It is highly intrusive because hidden ACMs need to be investigated before structural demolition exposes them.
What happens if asbestos is found?
The findings are used to define removal or other required controls before demolition disturbs the ACMs.
Is a roof sample sufficient before demolishing a garage?
Not necessarily. Demolition asbestos information needs to cover the structure and materials within the demolition boundary, including relevant linings, panels and other components.
Can a single campus building be surveyed for demolition while others stay occupied?
Potentially, with suitable separation, access and isolation arrangements. The intrusive area must be appropriately vacated and controlled, and shared interfaces must be addressed in the brief.
Are detached service enclosures included automatically?
No. List every structure and relevant component within the demolition instruction. A survey of the main building should not be assumed to cover an unlisted enclosure or annex.
Can I enquire about a site outside Cambridge city?
Yes. Send the address and service required for a surrounding location such as Histon, Impington, Milton, Girton, Fulbourn, Great Shelford, Sawston or Waterbeach. Attendance depends on scope, access and programme. Use the exact site address to identify the relevant authority and permissions.
Define the demolition boundary before the destructive survey starts
Send drawings, demolition scope, retained structures, soft-strip sequence, existing asbestos information, isolation constraints and programme. ASM can prepare the intrusive survey scope and written quotation.