Demolition asbestos surveys in Edinburgh
A fully intrusive survey designed to locate asbestos throughout the areas to be demolished. We coordinate scope, access and hazards so removal information can be built into tendering and the demolition sequence.
The building normally needs to be vacant and safe for destructive inspection. Agree service isolations, structural hazards, access and making-safe responsibilities before the survey begins.
Find asbestos before demolition starts
The survey should investigate all affected elements as far as reasonably practicable, including concealed and difficult-to-access locations.
Whole-building demolition
Systematic intrusive investigation across all accessible building elements and associated structures.
Partial demolition
Define the exact demolition boundary and include interfaces with retained areas.
Major strip-out
Match the survey depth to every removed finish, service, plant item and structural opening.
Site clearance
Include outbuildings, buried services or made-ground concerns where they form part of the project scope.
Information and access make the survey stronger
- 1
Define the demolition scope
Provide drawings, structural information, site boundaries and retained interfaces.
- 2
Make the site surveyable
Arrange vacancy, keys, isolation of live services and controls for structural or access hazards.
- 3
Inspect destructively
The team opens the building fabric and investigates concealed locations within the agreed scope.
- 4
Use the report
Design removal packages, tender accurately and sequence asbestos work before demolition.
Reduce unknowns in the demolition programme
Material locations
Plans, records and photographs help project teams understand where asbestos is present or presumed.
Access limitations
Any unsafe or inaccessible area remains clearly identified for further action before work reaches it.
Accredited results
Representative suspect materials are analysed under the accredited bulk identification method.
Tender information
The report supports contractor pricing, but removal scopes should verify quantities and site conditions.
Plan survey, removal and verification together
Removal and remediation
Scope licensed and non-licensed packages against the findings.
Find out moreAir monitoring and clearance
Schedule analytical attendance around relevant removal stages.
Find out moreAsbestos in soil
Plan for made ground, buried debris or unexpected fragments during excavation.
Find out moreSurvey cost guide
Demolition survey pricing starts from £320 + VAT and depends on access and complexity.
Find out moreReduce unknown asbestos before strip-out and demolition
Former industrial property, warehouses, public buildings, housing, dockland and redevelopment plots can contain concealed ACMs or historic alterations. The survey must cover the complete demolition boundary and be planned alongside isolation, structural risk, access and the removal programme.
Leith, Granton and industrial land
Demolition planning may need to consider made ground, legacy structures and asbestos in soils as well as the standing building.
Neighbouring and retained property
Shared walls, constrained sites, retained façades and busy surroundings need an agreed survey and exclusion strategy.
Speak to the Edinburgh team
Asbestos Surveying & Monitoring Ltd — Edinburgh Office
Third Floor, 3 Hill Street
Edinburgh EH2 3JP
Local team lead: James Brown, Regional Manager Scotland
James coordinates Edinburgh and Scottish enquiries with ASM surveyors, analysts and project teams.
0131 202 4096
info@asbestosSM.co.uk
Monday–Friday, 8:00am–6:00pm
Areas served
Edinburgh City Centre, New Town, Old Town, the Royal Mile, Leith, Stockbridge, Morningside, Newington, Marchmont, Bruntsfield, Haymarket, Murrayfield, Gorgie, Dalry, Corstorphine, Portobello, Liberton, Colinton, Craigentinny, Granton, South Gyle and Edinburgh Park, with wider attendance across Musselburgh, Dalkeith, Bonnyrigg, Penicuik, Livingston, West Lothian, East Lothian, Midlothian, Fife, Falkirk and Central Scotland subject to project requirements and availability.
For surveying enquiries use survey@asbestosSM.co.uk. For removal enquiries use removal@asbestosSM.co.uk.
National services and practical guidance
Demolition asbestos survey FAQs
Is an asbestos survey required before demolition?
For buildings that may contain asbestos, adequate information must be obtained before demolition so risks are identified and asbestos is removed or controlled. A demolition survey is designed for this fully intrusive purpose.
Does the building have to be empty?
Normally yes. Destructive inspection can create hazards and is not suitable for normal occupation. The site should be vacated and made safe, with services and structural risks addressed before attendance.
How much is a demolition asbestos survey in Edinburgh?
Our guide starts from £320 plus VAT. Size, construction, number of buildings, access, isolation, structural condition, sampling and reporting programme determine the quotation.
Does a demolition survey include underground asbestos?
Only if below-ground structures, services or made ground are explicitly included and can be investigated safely. Asbestos in soil usually requires a separate contaminated-land strategy and sampling plan.
Can removal start from the survey report?
The report provides key evidence, but the removal contractor should verify quantities, access and interfaces when preparing the plan of work and final quotation.
Get the scope right before work starts
Send the Edinburgh postcode, property or site details, photographs or plans, access information and required date.

