Before demolition and major strip-out

Demolition asbestos surveys in Edinburgh

A fully intrusive survey designed to locate asbestos throughout the areas to be demolished. We coordinate scope, access and hazards so removal information can be built into tendering and the demolition sequence.

UKAS 32982ISO/IEC 17020 inspectionISO/IEC 17025 testingEdinburgh & the Lothians

The building normally needs to be vacant and safe for destructive inspection. Agree service isolations, structural hazards, access and making-safe responsibilities before the survey begins.

Project purpose

Find asbestos before demolition starts

The survey should investigate all affected elements as far as reasonably practicable, including concealed and difficult-to-access locations.

Whole-building demolition

Systematic intrusive investigation across all accessible building elements and associated structures.

Partial demolition

Define the exact demolition boundary and include interfaces with retained areas.

Major strip-out

Match the survey depth to every removed finish, service, plant item and structural opening.

Site clearance

Include outbuildings, buried services or made-ground concerns where they form part of the project scope.

Before the visit

Information and access make the survey stronger

  1. 1

    Define the demolition scope

    Provide drawings, structural information, site boundaries and retained interfaces.

  2. 2

    Make the site surveyable

    Arrange vacancy, keys, isolation of live services and controls for structural or access hazards.

  3. 3

    Inspect destructively

    The team opens the building fabric and investigates concealed locations within the agreed scope.

  4. 4

    Use the report

    Design removal packages, tender accurately and sequence asbestos work before demolition.

Report value

Reduce unknowns in the demolition programme

Material locations

Plans, records and photographs help project teams understand where asbestos is present or presumed.

Access limitations

Any unsafe or inaccessible area remains clearly identified for further action before work reaches it.

Accredited results

Representative suspect materials are analysed under the accredited bulk identification method.

Tender information

The report supports contractor pricing, but removal scopes should verify quantities and site conditions.

Connected project services

Plan survey, removal and verification together

Removal and remediation

Scope licensed and non-licensed packages against the findings.

Find out more

Air monitoring and clearance

Schedule analytical attendance around relevant removal stages.

Find out more

Asbestos in soil

Plan for made ground, buried debris or unexpected fragments during excavation.

Find out more

Survey cost guide

Demolition survey pricing starts from £320 + VAT and depends on access and complexity.

Find out more
Edinburgh demolition context

Reduce unknown asbestos before strip-out and demolition

Former industrial property, warehouses, public buildings, housing, dockland and redevelopment plots can contain concealed ACMs or historic alterations. The survey must cover the complete demolition boundary and be planned alongside isolation, structural risk, access and the removal programme.

Leith, Granton and industrial land

Demolition planning may need to consider made ground, legacy structures and asbestos in soils as well as the standing building.

Neighbouring and retained property

Shared walls, constrained sites, retained façades and busy surroundings need an agreed survey and exclusion strategy.

Local office

Speak to the Edinburgh team

Asbestos Surveying & Monitoring Ltd — Edinburgh Office

Third Floor, 3 Hill Street
Edinburgh EH2 3JP

Local team lead: James Brown, Regional Manager Scotland

James coordinates Edinburgh and Scottish enquiries with ASM surveyors, analysts and project teams.

0131 202 4096
info@asbestosSM.co.uk

Monday–Friday, 8:00am–6:00pm

Areas served

Edinburgh City Centre, New Town, Old Town, the Royal Mile, Leith, Stockbridge, Morningside, Newington, Marchmont, Bruntsfield, Haymarket, Murrayfield, Gorgie, Dalry, Corstorphine, Portobello, Liberton, Colinton, Craigentinny, Granton, South Gyle and Edinburgh Park, with wider attendance across Musselburgh, Dalkeith, Bonnyrigg, Penicuik, Livingston, West Lothian, East Lothian, Midlothian, Fife, Falkirk and Central Scotland subject to project requirements and availability.

For surveying enquiries use survey@asbestosSM.co.uk. For removal enquiries use removal@asbestosSM.co.uk.

Frequently asked questions

Demolition asbestos survey FAQs

Is an asbestos survey required before demolition?

For buildings that may contain asbestos, adequate information must be obtained before demolition so risks are identified and asbestos is removed or controlled. A demolition survey is designed for this fully intrusive purpose.

Does the building have to be empty?

Normally yes. Destructive inspection can create hazards and is not suitable for normal occupation. The site should be vacated and made safe, with services and structural risks addressed before attendance.

How much is a demolition asbestos survey in Edinburgh?

Our guide starts from £320 plus VAT. Size, construction, number of buildings, access, isolation, structural condition, sampling and reporting programme determine the quotation.

Does a demolition survey include underground asbestos?

Only if below-ground structures, services or made ground are explicitly included and can be investigated safely. Asbestos in soil usually requires a separate contaminated-land strategy and sampling plan.

Can removal start from the survey report?

The report provides key evidence, but the removal contractor should verify quantities, access and interfaces when preparing the plan of work and final quotation.

Get the scope right before work starts

Send the Edinburgh postcode, property or site details, photographs or plans, access information and required date.

Need one of our other asbestos services in Edinburgh today?